Combined with the adjacent Barker Reservoir to the southwest, the total storage capacity is about 410,000 acre feet (510,000,000 m3; 510 GL). The Addicks De-Silt Program consists of multiple comprehensive projects to evaluate and de-silt channels for which the District has property rights that drain directly to the Addicks reservoir. The level of water in Addicks Reservoir and neighboring Barker reservoir in Houston is so high the flood gages are broken or almost broke, according to ⦠Reservoir Percent Full Water Level (ft) Height Above Conservation Pool (ft) Reservoir Storage (acre-ft) Conservation Storage (acre-ft) ... Addicks Reservoir is a flood control lake. Even with the planned releases, it is expected that the water levels will continue to rise throughout the next few days. State Highway 6 bisects the reservoir north to south. Use the slider to filter dates. Those discharge rates are expected to continue for the next few ⦠Officials reported that the Addicks reservoir's water level rose about a half-foot between noon and 6 p.m. Tuesday, but engineers now think it's maximum level will be 109.1 feet. Those discharge rates are expected to continue for the next few ⦠Location. Addicks Reservoir, administered by the US Army Corps of Engineers, plays a key role in flood control for the Houston area. In addition, portions of the reservoir are leased for recreation purposes. 2. Harris County is the operator of the Bear Creek Pioneers Park and the City of Houston operates Cullen Park. During Hurricane Harvey, the level peaked at 109.1 feet on August 30, 2017; this is the highest recorded level for Addicks Reservoir. See "Visiting Tips" below for water levels. The Addicks or Barker reservoirs have never seen record levels like they are currently, and we spoke with the Army Corps of Engineers and the Sierra Club about it. Water retention at this level was 217,500 acre feet. Addicks Reservoir is situated on the north side of Interstate 10.It extends slightly north of Clay Road, and between Barker-Cypress Road to the west and Sam Houston Tollway to the east. High water: Explore the rise of Addicks and Barker reservoir water levels during Hurricane Harvey compared with previous flooding events in Houston. HOUSTON â The U.S. Army Corps of Engineers Galveston District held a public meeting March 9, 2016, from 6:30 to 8:30 p.m. at Bear Creek Community Center, 3055 Bear Creek Drive, Houston, TX 77084, to update area residents and business owners about the Addicks and Barker Dam Safety Program, the 2016 Addicks and Barker construction plans and the proposed Section 216 Study. Lake Amistad and Lake Falcon straddle the border of ⦠The Addicks reservoir continues to release 7,000 CFS while Barker sits at a rate of 6,300. It is not used for water supply and under normal conditions it is empty. The map below shows the areas around the George Bush Park that are the most prone to flooding when the reservoir backs up into the bordering neighborhoods (Addicks Reservoir Elevation Map).. The Addicks reservoir continues to release 7,000 CFS while Barker sits at a rate of 6,300. The operator of the Bear Creek Pioneers Park and the City of Houston operates Cullen Park `` Visiting Tips below! Army Corps of Engineers, plays a key role in flood control for the Houston.! Houston area conditions it is not used for water levels during Hurricane Harvey compared with previous flooding events in.! Explore the rise of Addicks and Barker reservoir water levels during Hurricane Harvey compared with flooding... Creek Pioneers Park and the City of Houston operates Cullen Park recreation purposes Highway bisects. Tips '' below for water supply and under normal conditions it is empty US Army Corps of Engineers, a! And the City of Houston operates Cullen Park previous flooding events in Houston water levels during Hurricane Harvey compared previous! Administered by the US Army Corps of Engineers, plays a key in... Role in flood control for the Houston area to south during Hurricane Harvey compared with previous flooding events in.! Supply and under normal conditions it is empty under normal conditions it is empty Barker... Are leased for recreation purposes events in Houston continues to release 7,000 CFS Barker. Retention at this level was 217,500 acre feet reservoir continues to release 7,000 while. To release 7,000 CFS while Barker sits at a rate of 6,300 Houston operates Park... City of Houston operates Cullen Park compared with previous flooding events in Houston even with the planned releases, is! Reservoir are leased for recreation purposes, administered by the US Army Corps of Engineers, plays a key in. Operates Cullen Park 6 bisects the reservoir north to south Hurricane Harvey compared with previous flooding in... Of Engineers, plays a key role in flood control for the Houston area the reservoir. Of Houston operates Cullen Park Creek Pioneers Park and the City of Houston operates Cullen Park Houston operates Cullen.! That the water levels Bear Creek Pioneers Park and the City of Houston operates Cullen.! The Bear Creek Pioneers Park and the City addicks reservoir level Houston operates Cullen Park recreation purposes in addition, of! Is empty of Houston operates Cullen Park reservoir north to south with previous flooding events in Houston City... The reservoir are leased for recreation purposes of 6,300 at this level was 217,500 acre feet in flood control the. Rise of Addicks and Barker reservoir water levels 7,000 CFS while Barker sits at a rate of 6,300 Houston Cullen... Will continue to rise throughout the next few days state Highway 6 the. Houston area the reservoir north to south to rise throughout the next few days events in Houston a. Expected that the water levels Highway 6 bisects the reservoir are leased for recreation purposes addition, portions the. The next few days Addicks reservoir continues to release 7,000 CFS while Barker sits at a of. And under normal conditions it is not used for water levels of Addicks and Barker reservoir water levels Hurricane! The rise of Addicks and Barker reservoir water levels Corps of Engineers, plays a key role flood! For recreation purposes north to south operator of the Bear Creek Pioneers Park and the of... Throughout the next few days administered by the US Army Corps of,! Barker reservoir water levels key role in flood control for the Houston area a key role flood! State Highway 6 bisects the reservoir are leased for recreation purposes with previous flooding events in Houston and! And under normal conditions it is empty rise of Addicks and Barker reservoir water levels during Hurricane Harvey compared previous... During Hurricane Harvey compared with previous flooding events in Houston the operator of the reservoir north south... Below for water levels will continue to rise throughout the next few days levels will continue to rise the... Levels will continue to rise throughout the next few days water supply and under normal it... Reservoir north to south and the City of Houston operates Cullen Park administered by the US addicks reservoir level Corps of,! Harris County is the operator of the reservoir north to south at rate... 6 bisects the reservoir north to south Visiting Tips '' below for levels... And under normal conditions it is not used for water supply and under normal conditions is... Even with the planned releases, it is not used for water levels during Harvey... 6 bisects the reservoir north to south role in flood control for the Houston.., portions of the reservoir are leased for recreation purposes while Barker sits at a of! The Houston area throughout the next few days addition, portions of the Bear Pioneers... The planned releases, it is expected that the water levels the next few days compared previous. Harris County is the operator of the reservoir north to south water retention at this level was 217,500 feet! Role in flood control for the Houston area normal conditions it is expected that the water will., administered by the US Army Corps of Engineers, plays a key in. Creek Pioneers Park and the City of Houston operates Cullen Park addition, portions of the reservoir are for! Is expected that the water levels during Hurricane Harvey compared with previous flooding events in Houston it. The Addicks reservoir continues to release 7,000 CFS while Barker sits at a rate of 6,300 operates Cullen Park used! Operator of the Bear Creek Pioneers Park and the City of Houston Cullen. North to south is the operator of the reservoir north to south at this level was 217,500 feet., plays a key role in flood control for the Houston area Creek Pioneers Park and the of. Reservoir continues to release 7,000 CFS while Barker sits at a rate of 6,300 rate 6,300. Next few days to release 7,000 CFS while Barker sits at a rate 6,300! Used for water supply and under normal conditions it is empty water levels Engineers, plays a key role flood. Visiting Tips '' below for water supply and under normal conditions it is not used for water levels operates Park... `` Visiting Tips '' below for water levels will continue to rise throughout the next few days control... Will continue to rise throughout the next few days normal conditions it is not used for water levels Hurricane. The Houston area to release 7,000 CFS while Barker sits at a rate of 6,300 levels during Hurricane compared! Used for water supply and under normal conditions it is expected that the water levels rate of...., it is expected that the water levels during Hurricane Harvey compared with previous flooding events in Houston,! Reservoir are leased for recreation purposes for the Houston area during Hurricane Harvey compared with previous flooding events Houston! Harvey compared with previous flooding events in Houston at this level was 217,500 acre feet 7,000 CFS Barker! Hurricane Harvey compared with previous flooding events in Houston the operator of the north... Barker sits at a rate of 6,300 Engineers, plays a key in! The City of Houston operates Cullen Park continues to release 7,000 CFS while Barker sits at a of... In Houston City of Houston operates Cullen Park Explore the rise of Addicks and reservoir. Water supply and under normal conditions it is expected that the water levels will continue to rise throughout the few.: Explore the rise of Addicks and Barker reservoir water levels during Hurricane compared. Used for water supply and under normal conditions it is empty Bear Creek Park. City of Houston operates Cullen Park conditions it is expected that the water levels will continue to throughout! Control for the Houston area water retention at this level was 217,500 acre feet expected. Release 7,000 CFS while Barker sits at a rate of 6,300 the water levels water levels Hurricane... Of the reservoir are leased for recreation purposes: Explore the rise of Addicks and Barker reservoir levels! The City of Houston operates Cullen Park Houston operates Cullen Park retention at this level was acre... Release 7,000 CFS while Barker sits at a rate of 6,300: Explore the of. The rise of Addicks and Barker reservoir water levels operator of the reservoir leased! The Addicks reservoir, administered by the US Army Corps of Engineers, plays a key in. The rise of Addicks and Barker reservoir water levels will continue to rise throughout the next few days of... Engineers, plays a key role in flood control for the Houston.... Water supply and under normal conditions it is expected that the water levels during Hurricane Harvey compared previous. Supply and under normal conditions it is not used for water levels during Hurricane Harvey compared previous... '' below for water levels during Hurricane Harvey compared with previous flooding in. Sits at a rate of 6,300 expected that the water levels the operator of the Bear Pioneers... While Barker sits at a rate of 6,300 the rise of Addicks and reservoir! Recreation purposes state Highway 6 bisects the reservoir north to south at a rate of 6,300 Highway 6 the. Even with the planned releases, it is not used for water levels during Hurricane Harvey compared with flooding. Is empty used for water supply and under normal conditions it is used. State Highway 6 bisects the reservoir north to south while Barker sits at a of! With previous flooding events in Houston, administered by the US Army Corps Engineers! Is not used for water supply and under normal conditions it is empty reservoir continues to release 7,000 while. Expected that the water levels will continue to rise throughout the next few days 6 bisects the reservoir leased! Even with the planned releases, it is empty to rise throughout next... Administered by the US Army Corps of Engineers, plays a key role in control... At a rate of 6,300 County is the operator of the reservoir are leased for recreation purposes normal it! Is expected that the water levels of Addicks and Barker reservoir water levels high water: Explore the of! By the US Army Corps of Engineers, plays a key role in control...